Find in Library
Search millions of books, articles, and more
Indexed Open Access Databases
Application of displacement synchronization automatic control jacking technology in upgrading and reconstruction project of super large aqueduct of South-to-North Water Diversion Project
oleh: Wu Bo, Chen Xiaolu, Zhao Mingqin, Yang Xiaomin, Zhou Zhiyong
Format: | Article |
---|---|
Diterbitkan: | EDP Sciences 2021-01-01 |
Deskripsi
Jack-up technology is widely used in aqueduct reconstruction projects. In this paper, a self-developed displacement synchronous automatic control jack-up technology is introduced for the upgrading and reconstruction project of super large aqueduct in South-to-North Water Diversion Project. A new large span aqueduct jack-up construction technology is proposed and studied, and the key technologies of different heights of the aqueduct are discussed. During the jack-up reconstruction of the Lihe Aqueduct from Taocha Canal Head to Shahenan Canal Project in the first phase of the middle route of the South-to-North Water Transfer Project, the overall synchronous lifting of the aqueduct body was achieved by 72 cm, and then the aqueduct body was dropped proportionally. Finally, the jack-up reconstruction of the entrance section of the Lihe Aqueduct was achieved by 50 cm, and the exit section was not jack-up, and the middle section showed a linear change. The research results have a certain reference value for the reconstruction projects of similar structures with different heights at both ends.