Find in Library
Search millions of books, articles, and more
Indexed Open Access Databases
Analisis Mode Sistem Pembangkit Listrik Tenaga Hibrid Microhydro - Photovoltaic Array Menggunakan Homer (Studi Kasus : Kampung Bayang Janiah, Kabupaten Pesisir Selatan)
oleh: Novi Kurniasih, Refdinal Nazir
Format: | Article |
---|---|
Diterbitkan: | Universitas Andalas 2015-03-01 |
Deskripsi
In this study discusses the optimization of the design and analysis of engineering economics Hybrid Power Plant Off-Grid Microhydro - Photovoltaic Array with the help of software HOMER 2 version 2.81. Utilization of Hybrid Power Plant System can overcome the electrical problems in Bayang Janiah village, Nagari Koto Ranah, Bayang Utara Subdistrict, Pesisir Selatan District that is far from the reach of the grid and can improve the reliability of electricity economically in which initially operated only 12 hours/day sourced from microhydro power plant only, can be upgraded to full operation 24 hours/day. From the analysis that has been conducted, obtained monthly discharge of Bayang Janiah river availability using dependable discharge F. J. Mock 90% of 102 L/s to 14 m of effective head is able to move the hydro turbine to produce power of about 11,3 kW. Meanwhile, for an array of photovoltaic systems produce power equal to 8.4 kW with a number of solar modules by 84 modules and the number of battery 6 V 1.091 Ah required 8 units and a bidirectional converter with a total capacity of 10 kW, totaling 2 units. HOMER simulation results show that the determination of the configuration of the hybrid power plant system design most optimal for application in Bayang Janiah village lowest Total NPC is based on the integration between microhydro - photovoltaic array - battery bank - bidirectional converter. On the optimal system configuration, microhydro contribution of 78.945 kWh/yr, a photovoltaic array of 11.404 kWh/yr, with a Total NPC of $ 146.041, Levelized COE of $ 0,525/kWh, while the electrical energy consumption of 30.668 kWh per year and has excess energy of 59.608 kWh/yr, so it can meet the needs of household electricity to 56 households as well as social facilities in the village.